This paper introduces the layout of nealy 10000m2 factory building for cleaning medical instruments used only once and the system of air conditioning and cleaning project, expounds a few kinds of energy conservation methods which are adapted to the air conditioning design pro- cess. The design is proved rational through the practice, and can be taken as reference for the designers in the same area.